Vlaeynatie Office, Terneuzen, Netherlands

  • Type de bâtiment:
  • Office Buildings
Plein écran Fermer

Peikko Benelux has delivered DELTABEAM® Composite Beams , HPKM® Column Shoes, Anchor Bolts and the hidden corbel solution for the new office of ‘Vlaeynatie’ in Terneuzen. The contractor was very satisfied with the fast and easy construction method of the precast frame with the Peikko solutions. Long span guaranteed by DELTABEAM® generates flexible open spaces in the office.

Détails du Projet

Designer structurel:
Econstruct
Année de réalisation:
2015
Année de livraison:
2016

Parlez avec nos experts