The DOW Chemical Company, Terneuzen, Netherlands

  • Type de bâtiment:
  • Office Buildings
Plein écran Fermer

Peikko Benelux delivered a broad range of Peikko products for the new HQ of The DOW Chemical Company.

The synergy that is the result, enables a faster building method and therefore a shorter building phase. The combination of DELTABEAM® composite beams and the invisible PCs corbel system, results in optimal storey height. In total, more than 90 DELTABEAM® composite beams were delivered, with a total length of more than 600 meters!

Détails du Projet

Étages:
4
Designer structurel:
Geelhoed Engineering
Architect:
Group A
Année de réalisation:
2017
Année de livraison:
2019

Parlez avec nos experts