MEOS Campus, Regensburg, Germany

  • Type de bâtiment:
  • Office Buildings
Plein écran Fermer Street view

30% less slab thickness thanks to DELTABEAM®.

The barrier-free building ensemble combines a total of four interconnected buildings, each of which is separately accessible. With around 27,600 m², tenants have access to bright, modern space for offices, research & development and light industrial. A DGNB gold certification is in preparation.

Thanks to its concept based on renewable energies, the MEOS Campus is operated in a CO₂-neutral manner. This means that operating costs can be kept low in the long term and ESG strategies can be implemented.

Thanks to their many advantages, the DELTABEAM® composite beams from Peikko were able to convince OPTIMAL planTech GmbH. By using them, around 30% of the slab thickness could be saved in the project, resulting in significant CO₂ savings. The lack of visible beams enabled easy and space-saving HVAC installations and accelerated the construction process. The reduction in cubic meters per square meter also resulted in lower heating and cooling costs.

Lire la suite down-arrow.png

Détails du Projet

Taille du projet:
27.600 m2
Développeur:
OPTIMAL planTech GmbH
Entreprise de construction:
Bachl - Haus 1 / Max Bögl - Haus 2-4
Designer structurel:
OPTIMAL planTech GmbH
Année de réalisation:
2020
Année de livraison:
2023

Parlez avec nos experts

Sascha Schaaf

Sascha Schaaf

Leitung Projektentwicklung

Tel. +49 6436 916464
Mob. +49 175 271 2173
[email protected]