The centre consists of a composition of two contrasting structures: the black, monumental, one-storey logistics structure ‘planted’ on the ground, and the ‘soaring’ white three-story administration building.
A geothermal power plant was also used that met the highest ecological requirements.
To make the inside of the centre more related to the outside view, a lot of attention was devoted to the interior and exterior landscape architecture.
To facilate the work processes and contribute to their well-being, it was decided to look into the centre of the building innovatively and to rely on the latests tehnological solutions.
Various Peikko products where used on this project such as PETRA® Slab Hangers, Arnchor Plates, JENKA Lifting System, HPM® Rebar Anchor Bolt, and TERAJOINT®.